Possessing accrued precious encounter in cooperating with foreign consumers, EPG has set up a complete set of quality management system which is supplied with advanced inspection and check tools. We are aiming to fulfill the needs of the consumers about the entire world..
R series EPTcal EPTed EPT Characteristics
1. Functions:
one. EPT efficiency: ninety two%-97%
2. Compact composition: Little offset output, two stage and three stage are in the same box.
three. EPT precision: the EPT is manufactured of higher-quality alloy steel forging, carbonitriding and hardening therapy, grinding approach to make certain substantial precision and secure running.
4. EPT interchangeability: very modular, serial layout, robust versaEPTTty and interchangeability.
2. EPTnical parameters
Ratio | three.forty one-289.74 |
Input EPTT | .12-160KW |
Output torque | 61-23200N.m |
Output velocity | 5-415rpm |
Mounting sort | Foot mounted, flange mounted, foot and flange mounted, one-stage foot mounted, one stage flange mounted, Flange-mounted with prolonged bearing hub |
Enter Method | Flange enter(AM), shaft input(Ad), inline AC motor enter, or AQA servo motor |
Brake Launch | EPT-guide release(lock in the brake release placement), EPT-guide launch(autom-atic braking situation) |
Thermistor | TF(Thermistor security PTC thermisto) TH(Thermistor safety Bimetal swotch) |
Mounting Position | M1, M2, M3, M4, M5, M6 |
Kind | R17-R167 |
Output shaft dis. | 20mm, 25mm, 30mm, 35mm, 40mm, 50mm, 60mm, 70mm, 90mm, 110mm, 120mm |
EPT content | EPTT200 higher-energy forged iron from R37,47,fifty seven,sixty seven,seventy seven,87 |
EPT content | EPTT250 EPT power solid iron from R97 107,137,147,157,167,187 |
Warmth treatment EPT | carbonitriding and hardening treatment method |
Performance | 92%-ninety seven% |
Lubricant | VG220 |
Defense Course | IP55, F class |
EPT
ZheJiang EPT EPTT,Ltd,the predecessor was a state-owned army mould EPTTrprise, was estabEPTTd in 1965. EPT EPTTizes in the full EPTT EPTT resolution for high-stop gear producing EPTT dependent on the aim of quotPlatform Merchandise, Software Design and Specialist Services quot.
EPT have a powerful specialized pressure with more than 350 staff at present, incXiHu (West EPT) Dis.Hu (West EPT) Dis. over 30 engineering experts, 30 quality inspectors, masking an spot of 80000 sq. meters and sorts of EPTd processing EPTTs and testing equipments. We have a very good foundation for the sector software deveXiHu (West EPT) Dis.Hu (West EPT) Dis.ment and support of higher-finish pace EPTTs amp variators proudly owning to the provincial engineering EPT study cEPTTr,the lab of EPT velocity EPTTs, and the base of modern day R ampD.
Our Group
EPTT EPTT
EPTT:Insist on EPTTrovement,Attempt for Excellence With the deveXiHu (West EPT) Dis.Hu (West EPT) Dis.ment of products production indurstry,client never satirsfy with the current quality of our merchandise,on the contrary,wEPT the value of high quality.
EPTT plan:to increase the overall degree in the area of EPTT EPTT
EPTT View:Steady EPTTrovement , pursuit of excellence
EPTT Philosophy:EPTT EPTs benefit
three. Incoming EPTT EPTT
To set up the AQL appropriate stage of incoming substance handle, to offer the content for the EPTT inspection, sampling, immunity. On the acceptance of qualified goods to warehousing, substXiHu (West EPT) Dis.Hu (West EPT) Dis.rd items to just take return, check, rework, rework inspection responsible for tracking poor, to keep track of the supplier to consider corrective
steps to stop recurrence.
4. Process EPTT EPTT
The producing internet site of the initial assessment, inspection and closing inspection, sampling in accordance to the needs of some initiatives, judging the top quality alter craze
located irregular phenomenon of producing, and supervise the production department to increase, eliminate the abnormal phenomenon or condition.
five. FQC(Closing QC)
Following the manufacturing department will full the solution, stand in the customer’s situation on the finished item top quality verification, in orEPTTto guarantee the top quality of
client anticipations and needs.
6. OQC(Outgoing QC)
Soon after the merchandise sample inspection to deterEPT the experienced, allowing storage, but when the concluded product from the warehouse ahead of the official shipping of the items, there is a examine, this is referred to as the cargo inspection.Examine material:In the warehouse storage and transfer standing to validate, even though confirming the shipping of the
item is a merchandise inspection to deterEPT the certified goods.
7. Certification.
EPTT
Supply
Factory: ZheJiang EPT EPTT, Ltd.
(Prior name: HangEPT XiHu (West EPT) Dis.ngEPTg EPTT EPTTry)
Include: No.10,HuiEPTT EPTT Park, EPTTi City, XiHu (West EPT) Dis.hu (West EPT) Dis. District, HangEPT EPTT, ZheJiang Province, EPTT.
Net: